Skip to Contents

View Properties

Title:Sample Plan 5 - Riprap.pdf
Summary:Sample Plan No. 05
Expiration Date:
Abstract:
  • NOTE: Use of U.S.G.S.
  • quadrangle map(s) is recommended.
  • NOTES: 1.
  • Minimum recommended side slope ratio is 1.5 Horizontal: 1 Vertical.
  • 2.
  • Show any other cross-sections needed to adequately describe the scope of work. 3. Minimum recommended riprap toe dimensions are x = 2’ and y = 1’. Design criteria would vary with size of riprap used. 4. Registered Professional Engineer’s Certification and Seal are usually not required for this type of project.
Add Versions:Allowed
Author:
Catalog Ready:False
Comments Due Date:
Content Type: Adobe Portable Document Format (.pdf) - application/pdf
County:
Document Number:3930-PM-WM0036
Effective Date:
Exempt from Expiring:
File name:Sample Plan No. 05.pdf
Is Placeholder:No
Max Versions:1
Municipality:
Office/Bureau:Watershed Management
PWS ID:
PWS Name:
Size:96219
Copied From:
Last Synchronized:
Ready for Declare:No